Tradesperson 1 – Rubberizer job at Geita Gold Mining Ltd (GGML)
New
Today
Linkedid Twitter Share on facebook
Tradesperson 1 – Rubberizer
2025-06-27T11:00:17+00:00
Geita Gold Mining Ltd (GGML)
https://cdn.greattanzaniajobs.com/jsjobsdata/data/employer/comp_1687/logo/Geita%20Gold%20Mining%20Ltd%20(GGML).png
FULL_TIME
 
Dar es Salaam
Dar es Salaam
00000
Tanzania
Mining
Science & Engineering
TZS
 
MONTH
2025-06-30T17:00:00+00:00
 
Tanzania
8

PURPOSE OF THE ROLE:

The Role focuses on delivering high – quality rubber lining, ceramic tiling, and HDPE pipe fusion welding services across the process plant and associated external areas including Nyankanga Dam, TSF, Lone cone, Caf Plant and Dabenco water treatment plant. These specialized tasks are critical to ensuring   equipment longevity, operational efficiency and workplace safety.

QUALIFICATIONS:

  • Trade test Grade two or Level three in arc/fusion welding.
  • Must Possess Tanzania Driving License.

EXPERIENCE:

A minimum of 3 years working as Rubberizer in the mining industry on the following, Material selection, Maintenance and repairs, Mill lining, Primer and cement applications, HDPE welding.

ADDITIONAL REQUIREMENT:

  • HDPE Welding Techniques
  • Hot and Cold Splice Technique
  • Take and read measurements
  • Tiling and rubber lining technique
  • Use of SC2000 Solvent
  • Creativity
  • Skills in mixing compounds
  • Confined space work

MAIN OR KEY ACCOUNTABILITIES:

Safety

  • Adhere to safety requirement/procedures such as take 5, JSA and Isolations
  • Proactive managing and reducing all hazards in your area of responsibility
  • Maintain housekeeping in area of responsibility
  • Driving the risk assessment process within area of responsibility by using a Take 5 tool
  • Maintain housekeeping to the area of responsibility to prevent hazards
  • Hazards identified within main workshop, Outside support section and CAF plants

Rubberizing and Ceramic Tiling Projects: (Entire Process Plant, TSF, Lone Cone, Nyankanga, Caf and Dabenco)

  • Repair ball and Sag mill shell (During mills Relining)
  • Repair Water Pond membrane -plastic carpets.
  • Strip and replace worn out tiles on launders, chutes and pipes.
  • Strip and replace linatex rubber on launders, chutes, and pipes
  • Rubberize agitator shafts.
  • Application of solvent and SC2000 on a work surface
  •  Mixing of hardener and proper application of motor bond on a work surface.
  •  Replacement of trash and carbon safety screen Cloth.
  • Mixing of hardener and proper application of Cera-line on the wear joints/surface
  • Application of belazona and Sika flex compounds on a work piece

PVC/HDPE -Butt- Welding Joints

  • Fabrication and installation of HDPE pipe.
  • Electric Fusing of HDPE joints.
  •  Identification of right stubs for the right application
  •  Identification of sizes and Classes of HDPE. (PN12, PN10, PN6, PN16)
  • Identification of welding melting temperatures.

Conveyor Belts Pulley Lagging

  • Sizing of ceramic tiles for pulley lagging and its application
  • Sizing of linatex rubber lagging and SC2000 solvent applications
  •  Proper mixing of hardener and motor bond application for ceramic lagging

Machines /Equipment Operation

  • Cut HDPE pipes by using Chain saw,
  • Fusion welding activity by using HDPE- Butt-poly Welding Machine,
  • Smoothening of work surface by using Angle grinder,
  • Make the surface dry by using Blower,
  • Fusion welding of membrane/carpet by using Heat gun
  • Sizing Ceramic Tiles to fit the work piece by using cutting machine

Quality Control

  •  Maintain the required melting temperature on a weld joint
  • Testing and Inspections
  • Measurements and Evaluation
  • Identifying deviations and defects
  • Maintaining Consistency
Safety Adhere to safety requirement/procedures such as take 5, JSA and Isolations Proactive managing and reducing all hazards in your area of responsibility Maintain housekeeping in area of responsibility Driving the risk assessment process within area of responsibility by using a Take 5 tool Maintain housekeeping to the area of responsibility to prevent hazards Hazards identified within main workshop, Outside support section and CAF plants Rubberizing and Ceramic Tiling Projects: (Entire Process Plant, TSF, Lone Cone, Nyankanga, Caf and Dabenco) Repair ball and Sag mill shell (During mills Relining) Repair Water Pond membrane -plastic carpets. Strip and replace worn out tiles on launders, chutes and pipes. Strip and replace linatex rubber on launders, chutes, and pipes Rubberize agitator shafts. Application of solvent and SC2000 on a work surface  Mixing of hardener and proper application of motor bond on a work surface.  Replacement of trash and carbon safety screen Cloth. Mixing of hardener and proper application of Cera-line on the wear joints/surface Application of belazona and Sika flex compounds on a work piece PVC/HDPE -Butt- Welding Joints Fabrication and installation of HDPE pipe. Electric Fusing of HDPE joints.  Identification of right stubs for the right application  Identification of sizes and Classes of HDPE. (PN12, PN10, PN6, PN16) Identification of welding melting temperatures. Conveyor Belts Pulley Lagging Sizing of ceramic tiles for pulley lagging and its application Sizing of linatex rubber lagging and SC2000 solvent applications  Proper mixing of hardener and motor bond application for ceramic lagging Machines /Equipment Operation Cut HDPE pipes by using Chain saw, Fusion welding activity by using HDPE- Butt-poly Welding Machine, Smoothening of work surface by using Angle grinder, Make the surface dry by using Blower, Fusion welding of membrane/carpet by using Heat gun Sizing Ceramic Tiles to fit the work piece by using cutting machine Quality Control  Maintain the required melting temperature on a weld joint Testing and Inspections Measurements and Evaluation Identifying deviations and defects Maintaining Consistency
 
Trade test Grade two or Level three in arc/fusion welding. Must Possess Tanzania Driving License. EXPERIENCE: A minimum of 3 years working as Rubberizer in the mining industry on the following, Material selection, Maintenance and repairs, Mill lining, Primer and cement applications, HDPE welding.
professional certificate
36
JOB-685e79c156a0e

Vacancy title:
Tradesperson 1 – Rubberizer

[Type: FULL_TIME, Industry: Mining, Category: Science & Engineering]

Jobs at:
Geita Gold Mining Ltd (GGML)

Deadline of this Job:
Monday, June 30 2025

Duty Station:
Dar es Salaam | Dar es Salaam | Tanzania

Summary
Date Posted: Friday, June 27 2025, Base Salary: Not Disclosed

Similar Jobs in Tanzania
Learn more about Geita Gold Mining Ltd (GGML)
Geita Gold Mining Ltd (GGML) jobs in Tanzania

JOB DETAILS:

PURPOSE OF THE ROLE:

The Role focuses on delivering high – quality rubber lining, ceramic tiling, and HDPE pipe fusion welding services across the process plant and associated external areas including Nyankanga Dam, TSF, Lone cone, Caf Plant and Dabenco water treatment plant. These specialized tasks are critical to ensuring   equipment longevity, operational efficiency and workplace safety.

QUALIFICATIONS:

  • Trade test Grade two or Level three in arc/fusion welding.
  • Must Possess Tanzania Driving License.

EXPERIENCE:

A minimum of 3 years working as Rubberizer in the mining industry on the following, Material selection, Maintenance and repairs, Mill lining, Primer and cement applications, HDPE welding.

ADDITIONAL REQUIREMENT:

  • HDPE Welding Techniques
  • Hot and Cold Splice Technique
  • Take and read measurements
  • Tiling and rubber lining technique
  • Use of SC2000 Solvent
  • Creativity
  • Skills in mixing compounds
  • Confined space work

MAIN OR KEY ACCOUNTABILITIES:

Safety

  • Adhere to safety requirement/procedures such as take 5, JSA and Isolations
  • Proactive managing and reducing all hazards in your area of responsibility
  • Maintain housekeeping in area of responsibility
  • Driving the risk assessment process within area of responsibility by using a Take 5 tool
  • Maintain housekeeping to the area of responsibility to prevent hazards
  • Hazards identified within main workshop, Outside support section and CAF plants

Rubberizing and Ceramic Tiling Projects: (Entire Process Plant, TSF, Lone Cone, Nyankanga, Caf and Dabenco)

  • Repair ball and Sag mill shell (During mills Relining)
  • Repair Water Pond membrane -plastic carpets.
  • Strip and replace worn out tiles on launders, chutes and pipes.
  • Strip and replace linatex rubber on launders, chutes, and pipes
  • Rubberize agitator shafts.
  • Application of solvent and SC2000 on a work surface
  •  Mixing of hardener and proper application of motor bond on a work surface.
  •  Replacement of trash and carbon safety screen Cloth.
  • Mixing of hardener and proper application of Cera-line on the wear joints/surface
  • Application of belazona and Sika flex compounds on a work piece

PVC/HDPE -Butt- Welding Joints

  • Fabrication and installation of HDPE pipe.
  • Electric Fusing of HDPE joints.
  •  Identification of right stubs for the right application
  •  Identification of sizes and Classes of HDPE. (PN12, PN10, PN6, PN16)
  • Identification of welding melting temperatures.

Conveyor Belts Pulley Lagging

  • Sizing of ceramic tiles for pulley lagging and its application
  • Sizing of linatex rubber lagging and SC2000 solvent applications
  •  Proper mixing of hardener and motor bond application for ceramic lagging

Machines /Equipment Operation

  • Cut HDPE pipes by using Chain saw,
  • Fusion welding activity by using HDPE- Butt-poly Welding Machine,
  • Smoothening of work surface by using Angle grinder,
  • Make the surface dry by using Blower,
  • Fusion welding of membrane/carpet by using Heat gun
  • Sizing Ceramic Tiles to fit the work piece by using cutting machine

Quality Control

  •  Maintain the required melting temperature on a weld joint
  • Testing and Inspections
  • Measurements and Evaluation
  • Identifying deviations and defects
  • Maintaining Consistency

 

Work Hours: 8

Experience in Months: 36

Level of Education: professional certificate

Job application procedure

Interested and qualified? Click here to apply

 

All Jobs | QUICK ALERT SUBSCRIPTION

Job Info
Job Category: Engineering jobs in Tanzania
Job Type: Full-time
Deadline of this Job: Monday, June 30 2025
Duty Station: Dar es Salaam | Dar es Salaam | Tanzania
Posted: 27-06-2025
No of Jobs: 1
Start Publishing: 27-06-2025
Stop Publishing (Put date of 2030): 27-06-2067
Apply Now
Notification Board

Join a Focused Community on job search to uncover both advertised and non-advertised jobs that you may not be aware of. A jobs WhatsApp Group Community can ensure that you know the opportunities happening around you and a jobs Facebook Group Community provides an opportunity to discuss with employers who need to fill urgent position. Click the links to join. You can view previously sent Email Alerts here incase you missed them and Subscribe so that you never miss out.

Caution: Never Pay Money in a Recruitment Process.

Some smart scams can trick you into paying for Psychometric Tests.